This project includes designing, manufacturing, and delivering a new 585-Ton Emergency Gantry Crane, as well as installing and testing the new crane. The existing 340-Ton crane will also be removed. The three wire overhead conductors will be replaced with a four wire overhead conductor system and the existing STS crane main line will be replaced.